Sell your turbine

0417:40Grid

Five power plants. One line.

Wind, sun, storage, biogas and the substation that feeds them into the grid. Scroll along the line.

Power plant 01 / 05

Wind farm

Three 3 MW-class turbines on one site. Where everything we operate began.

Output
9 MW
Setup
3 turbines · 60 m hub height

Power plant 02 / 05

Solar park

Thirteen rows of module tables, tilted 25° to the south. It delivers when the wind drops at midday.

Output
9.6 MWp
Setup
39 tables · 4.2 ha

Power plant 03 / 05

Battery storage

Twenty-four containers. They absorb peaks from wind and sun and release them in the evening.

Output
20 MW / 40 MWh
Setup
24 containers · 2 h duration

Power plant 04 / 05

Biogas plant

Three digesters, one combined heat and power unit. Baseload that doesn't depend on the weather.

Output
1.5 MWe
Setup
3 digesters · 8,000 full-load hours

Power plant 05 / 05

Substation

All lines meet here and are stepped up to high voltage.

Output
110 / 20 kV
Setup
3 transformers · 63 MVA

0518:30Turbine Acquisition

We buy your wind turbine and take over the operator's technical and legal obligations.

  1. 01 · 1 business day

    First contact

    You send us the turbine model, rated power, year of commissioning and location. We tell you whether the turbine is a fit for us.

  2. 02 · 1–2 weeks

    Technical assessment

    We review operating data, maintenance history and existing expert reports, remotely or on site at the turbine.

  3. 03 · about 1 week

    Offer

    You receive a binding purchase offer that includes how the decommissioning obligation is handled.

  4. 04 · 2–4 weeks

    Contract

    We draft the purchase agreement and settle easements and land leases with the landowners.

    Transfers to usLand leases · Easements · Decommissioning obligation

  5. 05 · 4–8 weeks

    Handover

    Transfer of operations, re-registration with the grid operator, and we take over technical management.

    Transfers to usGrid operator · Technical management

Timings are guidelines. The binding schedule is part of our offer.

0807:00Contact

Talk to us about your turbine.

For a first assessment, we need the turbine model, rated output, year of construction and location. We'll get back to you with a concrete answer.

Address
Musterstraße 1, 12345 Musterstadt